External pump room consisting of two diesel pumps and all control wiring.
Heating, lighting, and power within pump room including air extract controls when pumps are in operation, water tank immersion heating and power.
Full monitoring works within pump room and all associated water tank monitoring
Internal building valve set arrangement supplying zones within the building, monitoring consisting of category A and B signals.
Networked monitoring panels; one situated in the pump room, one in the main reception area.
Trace heating and lagging system to external pipe work, aluminium cladding finish.