Opens in a new tab

Home / Projects / Aldermanbury Square

Aldermanbury Square

Complete electrical scope for the sprinkler plant room and the controls and interfaces of a four-room protected pre-action sprinkler system at 2 Aldermanbury Square in the City of London.

Start a project
aldermanbury square
Location
2 Aldermanbury Square, City of London
System Type
Sprinkler plant room and four-room protected pre-action
Scope
Complete electrical installation, controls and interfaces
Integration
Connected to wider building life-safety systems
Compliance
BS 7671 + project-specific fire protection standards
Status
Fully tested, commissioned and handed over with certification
The brief

Sprinkler plant room and four-room pre-action installation.

WSD delivered the complete electrical installation associated with the sprinkler plant room and a four-room protected pre-action sprinkler system at 2 Aldermanbury Square in the City of London.

The project started with detailed coordination meetings and site surveys to establish the operational requirements of both the plant room and the protected pre-action areas. Working closely with the sprinkler contractor, the main contractor and other trades, we built an installation strategy that ensured every critical fire protection asset received resilient, compliant electrical services.

aldermanbury square 00001

Our engineers installed containment systems, power supplies, control cabling and interface wiring throughout the sprinkler plant room and the protected areas. Particular attention was given to cable routing, equipment accessibility and future maintenance. The installation incorporated monitoring and control interfaces to enable effective communication between the pre-action systems and the wider building fire and life-safety infrastructure.

Throughout the programme, works were carefully phased to align with other trades and minimise disruption to the overall construction schedule. A comprehensive testing and commissioning programme followed, verifying the operation of every electrical system, control, alarm and monitoring function on the project. Delivery concluded with as-installed documentation, test certification, operation and maintenance information, and a formal client handover — leaving a fully operational and compliant fire protection installation behind us, delivered to BS 7671 and the project’s fire protection standards.

aldermanbury square 00002

Sprinkler plant room electrical

Containment, power supplies, control cabling and equipment interfaces throughout the sprinkler plant room.

Four-room pre-action controls

Control and interface wiring for a four-room protected pre-action sprinkler system.

Building life-safety integration

Monitoring and control interfaces connecting the pre-action systems back to the building's wider fire and life-safety infrastructure.

Testing, commissioning and handover

Full testing and commissioning of every electrical, control, alarm and monitoring function. As-installed drawings, test certification and O&M documentation issued at handover.

On site

The work,
in detail.

A small selection from the as-built record.

Services used

Three of our disciplines, one site.

Pump Wiring & Control Circuits for Sprinkler & Wet Riser Systems

Electrical containment, wiring and control circuits for sprinkler and wet riser pump systems. Plant room electrical install, designed and built in-house.

Open service

Pre-Action & Deluge Systems

The electrical side of pre-action and deluge fire suppression systems. Detection, control panels, cause-and-effect, integration. Tyco, Viking, Reliable, Victaulic.

Open service

Full Life Safety Monitoring

Centralised signal monitoring for sprinkler, wet riser and life safety systems. Local panel, remote diagnostics, integrated with the wider fire strategy.

Open service
More work

Other recent projects.

A couple more case studies along similar lines.

sherborne mrf

Sherborne MRF Sprinkler Upgrade

Replacement of zone-check systems and upgraded pump controls across a 12,000 m² material recovery facility, completed in two phased weekend shutdowns.

View project
central house

Central House

Networked addressable fire alarm system across 400+ devices, with graphics-panel monitoring and an ongoing maintenance contract.

View project
ley and wheeler 1

Ley & Wheeler Warehouse & Distribution

Self-regulating trace heating installation for sprinkler tanks and pipework in a −25 °C cold storage facility.

View project
aldermanbury square

Aldermanbury Square

Aspirating smoke detection across two server halls, with central monitoring and quarterly servicing.

View project
aldgate featured

Aldgate

Self-test emergency lighting retrofit across six floors, including monthly compliance reporting.

View project
chelsea barracks 00005

Chelsea Barracks

Electrical installation for the sprinkler pump room, monitored valve sets and trace heating frost protection at the Chelsea Barracks residential redevelopment in London.

View project

Got a project in mind?